Friday 27 April 2012

Construction

We started our filming in the tv studio of us  and immediatley we realised a problem, in our storyboard we had one of our titles be revealed out from behind a picture on a wall, this wouldn't be achievable in the tv studio as there where no pictures or uncoverd walls available and so we had to change one of the titles to be revealed on the desk.
We also realised that it would be difficult to do our establishing shot of the study as we were having to re-arange the room for shooting in the different areas of the room to get the lighting right and so we had to simply cut out the shot of the entire room as there was no way around it.
When we did our location shooting at my house we also came across a problem. We had originally decided to have us jumping from the garage roof in a shot where you see us on the roof and then jumping down out if shot. This turned out to be too difficult for us to do without having to actually jump off the roof and so we changed the shot to instead be just of pour feet landing on the floor.

When it came to editing our sequence together we found that we had put no shots of us each entering the room which we thought wouldn't be a problem but when put together it didn't make sense and so we then had to do some more filming of us each entering the room.

The music we decided to have with our opening sequence did not sync well with the begining video of te video and so we had to try and loop the begining of the song so that it reahed the climax part of the song at the right piont to go with our film. This was very difficult to do smoothly but with a lot of effort we mnaged to get it done effectively.

No comments:

Post a Comment